2016年ACCA知識點:PERFORMANCE INDICATORS 6

來源: 正保會計網(wǎng)校 編輯: 2016/03/07 11:01:13 字體:

ACCA P3 考試:PERFORMANCE INDICATORS 6

Fitzgerald and Moon building blocks

Section E(1) of the P5 study guide mentions three specific approaches or models:

·Balanced scorecard

·Performance pyramid

·Fitzgerald's and Moon's building blocks

The balanced scorecard approach is probably the best known but all seek to ensure that the net is thrown wide when designing performance measures for organisations so that factors such as quality, innovation, flexibility, stakeholder performance, and delivery and cycle time are listed as being important aspects of performance. Whenever an aspect of performance is important then a performance measure should be designed and used.

The Fitzgerald and Moon model is worth a specific mention here as it is the only model which explicitly links performance measures to the individuals responsible for the performance.

The model first sets out the dimensions (split into results and determinants) where key performance indicators should be established. You will see there is a mix of financial and non-financial, and both quantitative and qualitative:

·Results

·Financial performance

·Competitive performance

·Determinants

·Quality

·Flexibility

·Resource utilisation

·Innovation

The model then suggests standards for KPIs:

·Ownership: refers to the idea that KPIs will be taken more seriously if staff have a say in setting targets. Staff will be more committed and will better understand why that KPI is needed.

·Achievability: if KPIs are frequently and obviously not achievable then motivation is harmed. Why would staff put in extra effort to try to achieve a target (and bonus) if they believe failure is inevitable.

·Fairness: everyone should be set similarly challenging objectives and it is essential that allowance should be made for uncontrollable events. Managers should not be penalised for events that are completely outside everyone's control (for example, a natural disaster) or which is someone else's fault.

The model then suggests how employee rewards should be set up to encourage employees to achieve the KPI targets:

·Clarity: exactly how does performance translate into a reward?

·Motivation: the reward must be both desirable and must be perceived as achievable if it is to be motivating.

·Controllable: achievement of the KPI giving rise to the reward should be something the manager can influence and control.

Ken Garrett is a freelance lecturer and writer

我要糾錯】 責(zé)任編輯:小瑩子

免費試聽

  • Jessie《FR 財務(wù)報告》

    Jessie主講:《FR 財務(wù)報告》免費聽

  • 張宏遠《MA 管理會計》

    張宏遠主講:《MA 管理會計》免費聽

  • 何 文《SBL 戰(zhàn)略商業(yè)領(lǐng)袖》

    何 文主講:《SBL 戰(zhàn)略商業(yè)領(lǐng)袖》免費聽

限時免費資料

  • 近10年A考匯總

    歷年樣卷

  • 最新官方考試大綱

    考試大綱

  • 各科目專業(yè)詞匯表

    詞匯表

  • ACCA考試報考指南

    報考指南

  • ACCA考官文章分享

    考官文章

  • 往年考前串講直播

    思維導(dǎo)圖

回到頂部
折疊
網(wǎng)站地圖

Copyright © 2000 - 8riaszlp.cn All Rights Reserved. 北京正保會計科技有限公司 版權(quán)所有

京B2-20200959 京ICP備20012371號-7 出版物經(jīng)營許可證 京公網(wǎng)安備 11010802044457號